Shopping Malls & Cinema Projects
Oct-2008
Tung Ying Building Redevelopment (Rename: The One)
100mm thick AUGREEN Block Wall system was applied in cavity walls along the R.C. wall in the B1-B4 and back of houses for TUNG YING BUILDING Redevelopment, TST.
Key Benefits
Clean & tidy
No plastering! No wet-trade! No de-bonding!
Save space
Wall of 80mm thickness with 2hrs FRP it can achieve 50mm per wall compared with 130mm concrete block and two layers of plastering & wall of 100mm thickness with 4hrs FRP it can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.
Flexible
The required accesses for pipes and services can be chased after building the wall and can be easily changed.
Client: Chinese Estates
Architect: LWK
Main Contractor: Gammon
Privacy policy Terms and conditions Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Privacy policy | Terms and conditions