Macau Royal Dragon Hotel

 

Hotel & Residential Projects

Mar-16

 

AUGREEN Block Wall system was used for partitioning bedrooms and bathrooms.

 

Key Benefits

 

Quick installation

15m2-20m2 of wall area can be built per man day.

 

Clean & tidy

No plastering! No wet-trade! No de-bonding!

 

Save space

Wall of 100mm thickness with 4hrs FRP can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.

 

Flexible

The required accesses for pipes and services can be chased after building the wall and can be easily changed.

 

Client: Man Kin

Architect: A Design

Main Contractor: A Design

 

      