Commercial Projects
Jun-05
23 Wing Fung Street
AUGREEN Block Wall system was used for partitioning toilet rooms and dumbwaiter wall in the restaurant.
Key Benefits
Save space
Wall of 80mm thickness with 2hrs FRP can achieve 50mm per wall compared with 130mm concrete block and two layers of plastering & wall of 100mm thickness with 4hrs FRP can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.
Client: Swire Properties
Architect: LWK
Main Contractor: Hanison Contractors
Privacy policy Terms and conditions Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Privacy policy | Terms and conditions