Commercial Projects
Nov-06
Hong Kong Station Phase 1
AUGREEN Block Wall system was used for partitioning shops at MTR Hong Kong Station.
Key Benefits
Quick installation
15m2-20m2 of wall area can be built per man day.
Clean & tidy
No plastering! No wet-trade! No de-bonding!
Wall height
Our system does not require 2 layers of plastering, steel frame below 5.5m (80mm), 7m (100mm) door lintels and metal mesh.
Lightweight
The loading of AUGREEN Block is only 900kg/m3 (100mm), 750kg/m3 (80mm), which can be used for decoration works in existing buildings.
Load bearing
Being a non-load bearing wall, it can hang up to 250lbs per anchor. It can also drilled and tailed.
Client: MTR
Main Contractor: Goldfield N & W