Shopping Malls & Cinema Projects

Aug-2017

 

Maritime Square Phase II

 

100mm thick AUGREEN block wall system was applied in cavity walls along the R.C. wall in the B1-B4 and back of houses for Maritime Square Phase II.

 

Key Benefits

Clean & tidy
No plastering! No wet-trade! No de-bonding!

Save space
Wall of 80mm thickness with 2hrs FRP can achieve 50mm per wall compared with 130mm concrete block and two layers of plastering & wall of 100mm thickness with 4hrs FRP it can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.

Flexible
The required accesses for pipes and services can be chased after building the wall and can be easily changed.

 

Client: MTR
Architect: Aecom
Main Contractor: Build King Holdings Ltd

 

    