Shopping Malls & Cinema Projects
May-13
Smartland, Tsuen Wan
AUGREEN Block Wall system was used for partitioning shops.
Key Benefits
Quick installation
15m2-20m2 of wall area can be built per man day.
Load bearing
Being a non-load bearing wall, it can hang up to 250lbs per anchor. It can also drilled and tailed.
Save space
Wall of 80mm thickness with 2hrs FRP can achieve 50mm per wall compared with 130mm concrete block and two layers of plastering & wall of 100mm thickness with 4hrs FRP it can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.
Flexible
The required accesses for pipes and services can be chased after building the wall and can be easily changed.
Client: ARA Asset Management (Fortune) Limited
Architect: T&D Engineering Ltd
Main Contractor:
Privacy policy Terms and conditions Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved