Shopping Malls & Cinema Projects

Feb-14

 

Lung Cheung Plaza (Rename: Temple Mall North)

 

AUGREEN Block Wall System was used for partitioning retail shops.

 

Key Benefits

 

Quick installation

15m2-20m2 of wall area can be built per man day.

 

Clean & tidy

No plastering! No wet-trade! No de-bonding!

 

Flexible

The required accesses for pipes and services can be chased after building the wall and can be easily changed.

 

Hard & Strong

AUGREEN Block Wall System can achieve 2kN/m - crowd loading and it is stronger than gypsum boards for classroom partitions.

 

Client: The Link

Architect: Aedas

Main Contractor: Yat Sing B & D Limited

 

      

Privacy policy Terms and conditions Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved

Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved

Privacy policy | Terms and conditions