Hotel & Residential Projects
Dec-12
Harbour Bay Hotel, 1-03 Minden Avenue, TST
AUGREEN Block Wall system was used for partitioning bedrooms, kitchens and bathrooms.
Key Benefits
Clean & tidy
No plastering! No wet-trade! No de-bonding!
Save space
Wall of 80mm thickness with 2hrs FRP can achieve 50mm per wall compared with 130mm concrete block and two layers of plastering & wall of 100mm thickness with 4hrs FRP can achieve 30mm per wall compared with 100mm concrete block and two layers of plastering.
Lightweight
The loading of AUGREEN Block is only 900kg/m3 (100mm), 750kg/m3 (80mm), which can be used for decoration works in existing buildings.
Client: Winfine Mgt
Architect: Wong Man Hong
Main Contractor: Lee Tong E&M
Privacy policy Terms and conditions Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Copyright 2022 CaSO Engineering (HK) Company Limited All rights reserved
Privacy policy | Terms and conditions